384th Bombardment Group (Heavy) in World War II

Welcome to the 384th Bombardment Group (Heavy) Photo Gallery. This gallery makes available the photographic and documentary portion of the 384th BG record. All content on this gallery is visible to all visitors. Those wishing to enter a comment or contribute images will need to register and log in (links at left of Home page). Please register for an account when you need access beyond viewing gallery content. For additional information about the 384th BG, visit the 384th Bomb Group website⇗.

Guidance on contributing images can be obtained by downloading this PDF document:  Upload Instructions

FROM 22 NOVEMBER 2022 UNTIL FURTHER NOTICE: Due to a recent revision to the MySQL Database standard, a #1064 error may be encountered when trying to navigate to a photo album. Please report the name of the album you are trying to access using the "Contact webmaster" at the page bottom, right. Thanks for your help.

Home /

Operations Block

Operations Block.jpg Operations Block Interior 3ThumbnailsOperations BlockOperations Block Interior 3ThumbnailsOperations BlockOperations Block Interior 3ThumbnailsOperations Block

Excerpt from Air Ministry "Record Site Plan" dated August 1944.

Color Table:
Green: To be rebuilt to sound structure, followed by interior work.
Yellow: Planned reconstruction
Blue: Possible future reconstruction
Red: To be restored.

Buildings Key:
1. Picket Post
2. Station H.Q. Office (Nissen Huts) - Yellow portion to be the Visitor Centre and first Nissen Hut to be rebuilt.
3. Operations Block
4. Crew Briefing Room Annexe (Nissen Hut)
5. Interrogation & Office Annexe (Nissen Hut)
6. Latrine
7. Latrine
45. Bombsight Store & Workshop

Dimensions
368*404
File
Operations Block.jpg
Filesize
73 KB
Visits
1048

0 comments